Save
Close
Add seaman to favorites
Remove seaman from favorites
El. Eng. Assistant: Dyros - Container Ship / 2026-01-18 - 2026-04-30 (3 months)
El. Eng. Assistant: Beijing - Container Ship / 2025-05-17 - 2025-10-27 (5 months)
El. Eng. Assistant: Baltimore Star - Container Ship / 2024-08-20 - 2025-01-19 (5 months)
Electric Cadet: ARIES - Container Ship / 2022-12-03 - 2023-05-10 (5 months)
Electric Cadet: Zim Shanghai - Container Ship / 2021-11-11 - 2022-07-11 (8 months)
ETO: M.T. PACIFIC ZIRCON - Oil Products Tanker / 2025-02-15 - 2025-09-25 (7 months)
ETO: M.T. PACIFIC ZIRCON - Oil Products Tanker / 2024-02-29 - 2024-09-23 (7 months)
ETO: M.T. BRIGHTWAY - Crude Oil Tanker / 2023-05-09 - 2023-12-13 (7 months)
Electric Cadet: M.T. LIGURIAN SEA - Crude Oil Tanker / 2023-01-30 - 2023-05-08 (3 months)
Electric Cadet: M.V. DIAMONDWAY - Crude Oil Tanker / 2021-10-20 - 2022-06-09 (8 months)
ETO: UAFL Dubai - General Cargo / 2025-10-30 - 2026-05-08 (6 months)
El. Eng. Assistant: Costa Rican Star - Reefer / 2025-03-19 - 2025-08-04 (5 months)
El. Eng. Assistant: Costa Rican Star - Reefer / 2024-06-13 - 2024-10-28 (4 months)
El. Eng. Assistant: Costa Rican Star - Reefer / 2023-10-10 - 2024-01-29 (4 months)
Electric Cadet: Leevsten - RO-RO / 2022-11-28 - 2023-05-06 (5 months)
ETO: MSC Nahara - Container Ship / 2026-02-03 - 2026-08-18 (6 months)
ETO: MSC Kumsl - Container Ship / 2025-06-11 - 2025-12-02 (6 months)
El. Eng. Assistant: MSC Vancouver - Container Ship / 2024-09-16 - 2025-03-15 (6 months)
El. Eng. Assistant: MSC Loreto - Container Ship / 2023-09-01 - 2024-02-01 (5 months)
Electric Cadet: MSC Asli - Container Ship / 2022-12-01 - 2023-05-01 (5 months)
El. Engineer: Hors - Crude Oil Tanker / 2025-07-21 - 2025-10-31 (3 months)
El. Engineer: Gloria - Oil Products Tanker / 2024-08-15 - 2024-11-06 (3 months)
Electric Cadet: SPK-4 - Crane vessel / 2023-03-01 - 2023-04-28 (2 months)
Electric Cadet: SPK-4 - Crane vessel / 2022-08-29 - 2022-12-31 (4 months)
Electric Cadet: SPK-4 - Crane vessel / 2021-03-09 - 2021-05-03 (2 months)
ETO: MV NORDPHANTER - Container Ship / 2025-04-29 - 2025-08-31 (4 months)
ETO: MT LEOPOLD - Oil Products Tanker / 2024-10-20 - 2025-01-27 (3 months)
ETO: MT ELAURA - Bunkering Vessel / 2023-11-07 - 2024-04-02 (5 months)
Electric Cadet: MT IMPERIAL - Oil Products Tanker / 2022-09-30 - 2023-04-25 (7 months)
Electric Cadet: MT ZEFYROS - Chemical tanker / 2021-12-09 - 2022-05-11 (5 months)
2nd Electrical Engineer: Atlantic Reefer - Reefer / 2023-12-11 - 2024-05-06 (5 months)
Electric Cadet: Vitus Bering - Standby-safety vessel / 2023-01-07 - 2023-04-17 (3 months)
Electric Cadet: Slavyanka - Reefer / 2022-07-21 - 2022-09-11 (2 months)
Electric Cadet: Pavel Chernysh - Crude Oil Tanker / 2021-06-18 - 2021-09-01 (2 months)
ETO: Jason - Chemical Tanker / 2024-11-21 - 2025-05-14 (6 months)
ETO: Taurus - Chemical Tanker / 2024-01-08 - 2024-05-15 (4 months)
ETO: Geba - Chemical Tanker / 2023-10-18 - 2024-01-04 (3 months)
El. Eng. Assistant: TETI - Chemical Tanker / 2023-10-10 - 2023-10-17 (7 days)
Electric Cadet: Ahtiar - Fishing vessel / 2022-12-11 - 2023-04-10 (4 months)
ETO: APL TURKEY - Container Ship / 2026-06-05 - 2026-12-10 (6 months)
El. Engineer: ANL WARRNAMBOOL - Container Ship / 2025-08-22 - 2026-01-18 (5 months)
El. Eng. Assistant: APL TURKEY - Container Ship / 2024-11-30 - 2025-05-12 (5 months)
El. Eng. Assistant: CMA CGM PUGET - Container Ship / 2024-01-11 - 2024-07-12 (6 months)
Electric Cadet: Helios - Crude Oil Tanker / 2022-12-06 - 2023-04-05 (4 months)
El. Eng. Assistant: Msc Mexico v - Container Ship / 2024-06-17 - 2024-09-24 (3 months)
Electrician: M.V Margaritaville at sea islander - Passenger vessel / 2024-04-14 - 2024-05-18 (1 month)
Electric Cadet: M.V MSC Mundra VIII - Container Ship / 2022-09-10 - 2023-03-27 (7 months)
Electric Cadet: M.V Spirit of Singapore - Container Ship / 2021-10-24 - 2022-02-19 (4 months)
Electric Cadet: Sprit of Shanghai - Container Ship / 2020-09-15 - 2021-05-31 (9 months)
Electric Cadet: Discoverer - Bulk Carrier / 2022-05-25 - 2023-03-26 (10 months)
Electrician: Ostrovnoy-11 - Fishing vessel / 2020-12-20 - 2021-06-06 (6 months)
Electrician: Winner - General cargo / 2020-08-10 - 2020-09-01 (1 month)
Electrician: KIL-927 - Crane vessel / 2018-11-01 - 2019-02-24 (4 months)
Ref. Engineer: CMA CGM BAIKAL - Container Ship / 2024-05-22 - 2024-10-09 (5 months)
Ref. Engineer: CNC LION - Container Ship / 2023-07-17 - 2023-11-26 (4 months)
Electric Cadet: AFRICA ONE - Container Ship / 2022-09-14 - 2023-03-25 (6 months)
Electric Cadet: Sixtine - RO-RO / 2021-10-17 - 2021-12-19 (2 months)
Electric Cadet: MIR - Yacht / 2020-09-28 - 2020-11-29 (2 months)
El. Eng. Assistant: Tumnin - Fishing vessel / 2023-11-30 - 2024-05-08 (5 months)
El. Eng. Assistant: Presige D - Bulk Carrier / 2023-10-03 - 2023-11-23 (2 months)
Electric Cadet: Krassin icebreaker - Icebreaker / 2023-02-21 - 2023-03-21 (1 month)
Electric Cadet: Krassin icebreaker - Icebreaker / 2022-11-28 - 2022-12-28 (1 month)
Electric Cadet: Marshal Tukhachevskiy - Oil Products Tanker / 2022-08-31 - 2022-10-31 (2 months)
El. Engineer: OT2017 - Tug boat / 2025-02-03 - 2025-11-10 (9 months)
El. Eng. Assistant: HISTORY MARIA - Container Ship / 2023-08-07 - 2024-04-20 (8 months)
Electric Cadet: Fortune - Oil Products Tanker / 2022-08-19 - 2023-03-12 (7 months)
Motorman: Kapitan Schemilkin - Oil Products Tanker / 2021-11-14 - 2022-04-05 (5 months)
Motorman: Astrahan sity - Chemical tanker / 2021-03-26 - 2021-07-18 (4 months)
Ref. Engineer: ACHELOOS - Container Ship / 2024-11-07 - 2024-11-19 (12 days)
El. Eng. Assistant: MANZANILLO EXPRESS - Container Ship / 2024-05-13 - 2024-10-19 (5 months)
El. Eng. Assistant: AKADIMOS - Container Ship / 2024-02-07 - 2024-03-08 (1 month)
El. Eng. Assistant: MSC AZOV - Container Ship / 2023-07-12 - 2023-11-27 (4 months)
Electric Cadet: Maersk Camden - Container Ship / 2022-08-26 - 2023-03-10 (6 months)
ETO: Oleander - Container Ship / 2025-02-13 - 2025-07-06 (5 months)
ETO: Mayfield - Container Ship / 2024-06-01 - 2024-12-07 (6 months)
El. Eng. Assistant: Tangier Express - Container Ship / 2023-12-03 - 2024-04-06 (4 months)
Electric Cadet: Granit - Tug boat / 2022-12-20 - 2023-02-27 (2 months)
Electric Cadet: MSC Altamira - Container Ship / 2021-03-24 - 2021-11-17 (8 months)
El. Eng. Assistant: MSC PALERMO - Container Ship / 2025-04-11 - 2025-11-25 (7 months)
El. Eng. Assistant: MSC NITYA B - Container Ship / 2024-03-02 - 2024-09-14 (6 months)
El. Eng. Assistant: MSC AURELIA - RO-RO / 2023-07-21 - 2023-11-26 (4 months)
Electric Cadet: MSC CAITLIN - Container Ship / 2022-08-16 - 2023-02-25 (6 months)
Electric Cadet: MSC TORONTO - Container Ship / 2021-06-19 - 2022-01-30 (7 months)
ETO: MV Green Park - Container Ship / 2025-05-05 - 2025-10-09 (5 months)
ETO: LPG/C Ullswater - LPG Tanker / 2024-07-20 - 2024-10-12 (3 months)
ETO: M/V Green Dawn - Container Ship / 2023-12-02 - 2024-05-05 (5 months)
El. Eng. Assistant: M/V Green Ocean - Container Ship / 2023-05-24 - 2023-10-28 (5 months)
Electric Cadet: MSC Altamira - Container Ship / 2022-08-27 - 2023-02-23 (6 months)
Electrician: Astro Nekkar - Bulk Carrier / 2025-11-06 - 2026-04-14 (5 months)
Electrician: ASTRO MEROPE - Bulk Carrier / 2025-03-26 - 2025-08-29 (5 months)
Electrician: MV HALLEY - Container Ship / 2024-03-02 - 2024-08-30 (6 months)
El. Eng. Assistant: MSC SHANELLE V - Container Ship / 2023-06-27 - 2024-01-14 (7 months)
Electric Cadet: Volaris 51 - General Cargo / 2022-06-15 - 2023-02-17 (8 months)
2nd Engineer: MARVEL 3 - Tug boat / 2022-10-04 - 2023-02-08 (4 months)
2nd Engineer: MARVEL 3 - Tug boat / 2022-04-07 - 2022-10-03 (6 months)
2nd Engineer: MARVEL 3 - Tug boat / 2021-10-05 - 2022-04-06 (6 months)
2nd Engineer: SURODOG 7 - Tug boat / 2021-06-26 - 2021-10-04 (3 months)
2nd Engineer: SURODOG 7 - Tug boat / 2021-05-05 - 2021-06-25 (2 months)